St Pauls – Buildcorp – September 2018: 2400m2 of Structural roof framing.

Noreast Plot Darling Harbour – Lend Lease – February 2018: Complete Site Set up.

Tiffany & Co – Built – August 2018: BOH Timber screens.

Gallipoli – Lipman – March 2018: Front Entry screens and Pergolas.

Governor Macquarie Tower – Girvan Waugh – September 2017: Supply & installation of decking for balcony.

HSBC Randwick – Built – September 2017: Frame work for timber flooring and stairs.

Forbes St Darlinghurst – Built – August 2017: Heritage works.

Murray Rose – Lend Lease – July 2017: Supply, Install & remove temporary decking & covered walkway.

King St – Built – July 2017: Heritage Building complete restoration.

Macquarie University – FDC Construction & Fitout – July 2017: Savcon was involved in the supply & installation of a Timber Decking to Building C.

Reckitt Benckiser – FDC Construction & Fitout – April 2017: Decking.

Westpac – FDC Construction & Fitout – March 2017: Supply & installation of sub-flooring.

Travelodge Sydney – Taylor Construction Group – March 2016: With a non existent pool area, new floors and rooms were made for the growing travel market in Sydney.

Mick Simmons  479 George St – Built – November 2015: Savcon’s involvement was required for the various building works. With the new build taking place the carpentry works were throughout and required our services.

HC Coombs Centre Balustrade (RBA) – Built – August 2015: With Heritage comes make good or new for old works. Savcon did just that with these heritage verandahs, finished exactly as was built many years ago

Norton Rose – Built – June 2015: A seminar room fit out with extreme detail and shop drawing design.

Virgin Lounges Canberra (2013), Melbourne (2013), Perth (2015) – Built: With Savcon’s diversity, Built NSW contracted the complete detailed wall package comprising of beautiful Australian Hardwoods and various finishes.

Kaldor Art Exhibition 2015 & Object Gallery – Built – June 2015: An art gallery that had intent and required quick design details on the go, A great transformation and spectacle

St Canice Church – St Canice Church – November 2014: A project that gives back to the community, the newly transformed garden providing place of purpose for the refugees.

Bills Café – Toga – August 2014: Bills required precise workmanship for his new café in Bondi Beach. The ceilings were a major feature & Savcon was contracted for this.

Rouse Hill Town Centre – MacTech – August 2014: A small job but detailed timber & glass petition

Fair Work Commission – Built – April 2014: As with all court rooms the judges require to be elevated above the attendees. Savcon made all the floor and passage ways for this project.

Birkenhead Point – Mainbrace – September 2013: Not a massive package but one that Savcon was proud to be involved with.

Christian Dior – Built – July 2013: Savcon’s involvement was required for the various building worked

Atura Hotel – Built – October 2013: A typical hotel type of package with multiple skirtings, FFE, decking and feature screens.

Kaldor Art Exhibition 2013 – Built – March 2013: With Art comes interpretation, no doubt the Kaldor is just that and an amazing transformation of Walsh Bay Pier 2/3

P&O Pacific Pearl – Lipman – September 2012: As all Ships need renovating Savcon was called upon to re-install the timber flooring to the Salt Grill in Sydney’s dry dock. A unique project to be involved in.

AMP Change Rooms Sydney – Built – March 2012: A small end of trip facility within the carpark of the AMP Building.

Frasers Student Accommodation – Built – November 2011: Savcons involvement was required for the various building works.

The Blacket – Sydney – Built – July 2011: Savcon was required for the early base build works for this project. Once base build was complete we were awarded the contract for the Louis Vuitton fit out

Quest Serviced Apartments Campbelltown – Built – August 2010: A typical hotel type package off multiple skirtings, FFE, feature screens and decking.

Event Gold Class Cinemas Castle Hill – Built – April 2010: Savcon was fortunate to install the plats to the newly configured Gold Class seating and experience. All 5 cinemas and kitchen installed in 5 weeks.

Holiday Inn Haymarket – Holiday Inn Hotels – February 2008: A typical hotel type package off multiple skirtings, FFE, feature screens and decking.